gotcha Posted September 8, 2014 Report Share Posted September 8, 2014 pls try to optimize early ESToomere and mjens 2 Quote Link to comment Share on other sites More sharing options...
Corwin Posted September 21, 2014 Author Report Share Posted September 21, 2014 (edited) So it was a bit trickier than expected because I had to raise the kitchen counters so the washing machine would fit underneath higher than the original kitchen setup allowed, but we finally started using the kitchen today. About time too, because tomorrow we're starting the destruction and rebuilding of the roof. It's far from perfect, a few things aren't straight, a few things are already damaged because we bought the furniture used and cheap, and I had to do what I could to adjust it to fit. I still have to finish the doorways, the shelves under the stairs (left of the doorway on the first shot), and put the planks at the feet of the furniture to hide the supports and pipes below. My wife likes it though so mission accomplished! The two extra appliances we had to buy (fridge and dishwasher) we chose to go for extra energy saving stuff (A+++) because electricity is expensive in Germany (biggest of our bills so far). About the roof, I had a bad surprise last week after removing the layer of concrete from the floor of the attic, that all of the beams going across the house and forming the ceilings and hold the walls together (except the main center one that holds all of those) are completely wasted. Basically, anything that was oak survived the years, anything that was pine was eaten by insects or rotted away under the concrete/plaster. So on top of redoing the roof itself, we now have to redo the floor underneath it to replace all of those transversal beams, and so that means we are also breaking all of the ceilings in the 1st floor rooms. Luckily that only affects the main house, not the extension that was built on top of it (got its own roof) so we can keep on living there while the rest of the house is carved open and rebuilt. The house is now surrounded by scaffoldings, my brother arrives this afternoon and we're starting the work tomorrow with the carpenter and his apprentice. Was supposed to last 2 weeks but with those additional beams, it'll probably be more around 3. Was supposed to cost around 20000 euros and will probably be more like 25000. Here's the attic before and after removing the concrete: (You can see the spot where I had to remove the chimney to pass the electrical cables down to the living room in the first shot there). Edited September 21, 2014 by Corwin e-freak, Sprony, KoKo5oVaR and 10 others 13 Quote Link to comment Share on other sites More sharing options...
Sprony Posted September 21, 2014 Report Share Posted September 21, 2014 Like I said before, big fan of this thread and I love what you are doing with it. However, all this bad news reminds of this movie a lot: I hope things turn out ok. Quote Link to comment Share on other sites More sharing options...
FrieChamp Posted September 22, 2014 Report Share Posted September 22, 2014 The two extra appliances we had to buy (fridge and dishwasher) we chose to go for extra energy saving stuff (A+++) because electricity is expensive in Germany (biggest of our bills so far). Is this going to be your first winter in the house? What about heating? That's usually a big cost factor - especially in old houses. I heard that a lot of French heat with elictricity powered radiators but in Germany that's rather uncommon. A new heating insulation will increase your renovation costs further but save you money down the line (and make the house more attractive to tenants/buyers if that day will come). ⌐■_■ and KoKo5oVaR 2 Quote Link to comment Share on other sites More sharing options...
KoKo5oVaR Posted September 22, 2014 Report Share Posted September 22, 2014 It's true you could isolate the attic for the winter, i don't know if covering the roof or the attic floor with glass wool or rock wool would be very expensive ? Well at least, i don't know if it would be as expensive as the heat losses during the winter, that should be around 6€ the m². Quote Link to comment Share on other sites More sharing options...
Corwin Posted September 22, 2014 Author Report Share Posted September 22, 2014 Definitely planning on isolating the whole thing before the winter (before the end of october is the plan), both the roof itself and the floor below it that we have to redo, or we'll freeze our asses off. When I mentioned "biggest bill so far" I was talking about other places we lived at since we are in Germany, we always got money back for heating and water but always paid extra for eletricity. The heating system uses gas, and was installed brand new in 2007 so that's cool. I don't think I would have bought if either the windows or the heating were bad, but both are ok.The old isolation works suprisingly not too bad as far as I could see, it seems to not loose too much heat at least in the rooms we did heat when it got down to 8 degrees and below outside for a couple weeks in August. Sort your weather out Germany... We broke all of the space between the beams under the attic floor today and removed all the dust. We start replacing the beams tomorrow and breaking the two walls at both ends of the roof. Photos coming soon e-freak 1 Quote Link to comment Share on other sites More sharing options...
Izuno Posted September 22, 2014 Report Share Posted September 22, 2014 Damn, Corwin. You have some balls attempting this, let alone in actually pulling it off. Respect. e-freak and Corwin 2 Quote Link to comment Share on other sites More sharing options...
Corwin Posted September 23, 2014 Author Report Share Posted September 23, 2014 Here's a photo dump of the progress of the first 2 days of work. We had one more bad news: one of the vertical beams in the corner is rotten to the core so we have to replace it and that means breaking part of the wall of the bathroom (basically the only room that we didn't want to touch too much) and since my wife and kids were holed up in that room and the one next to it, they have to move out. That doesn't raise the price much though, got a new estimation by the carpenter and we should be able to handle it. To make sure we don't get more bad news I spent part of the afternoon exposing all of the beams on the 1st floor so we could check them out, and it's all ok for the rest. The carpenter got in touch with his old landlord and we get a small flat just across the road for 130 euro a month so that's ok. It's super old and crap and smells like the old caravan abandoned in the forest behind my grandparents' place when I was a kid, but that'll do for a week or two, and we are literally 100m away from our place if we need anything. We'll probably move there tomorrow and put the stuff in those rooms under blankets and such. It sucks to move out just when we just got the kitchen working, but we have to bite the bullet. You can see in that one how eaten the beams were. It's actually pretty scary to think they were holding the ceiling above us. Some break in half with just a hit from a mace. ESToomere, Sprony, Squad and 4 others 7 Quote Link to comment Share on other sites More sharing options...
Corwin Posted September 29, 2014 Author Report Share Posted September 29, 2014 Been at it for 1 week and a day, and all the beams supporting the roof itself (top ceiling/floor) are replaced and the roof is gone! We covered it for the rain, and now I pray that it doesn't rain too much this week so we can proceed. We do have a few things we can do around the house if it rains outside, but not more than a day's worth. Part of the new beams for the roof have been delivered too, a crane-truck will come soon to bring the main one up to the top. I also decided to open up the space a bit more in the house now that I've seen the ceiling off, so while I was breaking the chimney conduct on the second floor I also broke the wall around it, so we turn a tiny room + a decent one into a massive one that has an open ceiling and an office above. Kind of a loft in the end. That allows us to get rid of the shitty doorway that was entering the tiny room, which was at the top of the stairs, and had an extra step, which made it dangerous for a kid (hit your foot on the step, and you fall into the stairs). We'll also move the existing doorway into the main room a bit back into the corridor so the stairs up to the office space under the roof is part of the room and not out of it, so we don't need a door for it either. penE, KoKo5oVaR, Buddy and 7 others 10 Quote Link to comment Share on other sites More sharing options...
FMPONE Posted September 29, 2014 Report Share Posted September 29, 2014 Dude, the brushwork on this house fucking blows. Good luck text_fish 1 Quote Link to comment Share on other sites More sharing options...
RaVaGe Posted September 29, 2014 Report Share Posted September 29, 2014 That's a shitload of work, I wish you good luck because you'll need it, if you have some questions about furnitures/carpentry, I could probably help you . Corwin 1 Quote Link to comment Share on other sites More sharing options...
Buddy Posted September 30, 2014 Report Share Posted September 30, 2014 Brushes > Meshes less wobbly 2d-chris, Sjonsson, FMPONE and 1 other 4 Quote Link to comment Share on other sites More sharing options...
Sjonsson Posted September 30, 2014 Report Share Posted September 30, 2014 IRL Level Design seems very time consuming, GLHF! Looking good! Quote Link to comment Share on other sites More sharing options...
2d-chris Posted September 30, 2014 Report Share Posted September 30, 2014 your supposed to get slaves to make it for you ... Quote Link to comment Share on other sites More sharing options...
Corwin Posted October 3, 2014 Author Report Share Posted October 3, 2014 I have a roof now! We still have to put tiles on it on Monday, and finish the edges, gutters, etc but the bulk of the work is done. We also broke a whole lot more stuff with my brother to prepare for isolation/renovation of the walls and beams in the bedrooms (carving out some of the old dirt to make space to refill with plaster and such). My brother left today, and we can't work on the house as it's a public holiday here, so I'll enjoy a long weekend to rest a bit from the work. Feels good to have made decent progress on the house in such a short time though, my brother was here only 2 weeks and we've removed the roof, changed all the horizontal beams under it, built a new one, opened a few walls, removed all the remaining wood panels in the house, and evacuated 6 waste containers of around 5+ tons each. There will be some weeks before I get the windows to go in the attic, so after we're done covering the roof with the tiles and such, I'll focus on isolating it and the walls in the bedrooms for a bit. I can keep the scaffoldings for another 4 weeks if I want to so that's nice, I'll have time to do the shutters and install them. Sprony, jd40, Vilham and 6 others 9 Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.